Damage to NS cab door, NS wheel arch and cab quarter panel. Door dent was pulled out and metal reshaped. Repair was completed and all three areas were painted in the same day. This repair was carried out at the customers place of work.













Damage to NS cab door, NS wheel arch and cab quarter panel. Door dent was pulled out and metal reshaped. Repair was completed and all three areas were painted in the same day. This repair was carried out at the customers place of work.














This repair came to us through C3 Construction Ltd, a Leicester-based construction company operating a fleet of heavy plant across multiple active sites

A specialist in temperature-controlled transport, based in Dartford and operating close to the M25 motorway network, came across us through a Google search when a truck needed repairing.

This repair came to us through one of our Fleet Management company customers, who contacted us on behalf of an ambulance operator following a significant incident.
GET IN TOUCH
by
Tags: