This van had damage to the nearside cab cone and nearside front wheel arch. The repairs took 2 working days and were completed at the customers site.










This van had damage to the nearside cab cone and nearside front wheel arch. The repairs took 2 working days and were completed at the customers site.











This repair came to us through C3 Construction Ltd, a Leicester-based construction company operating a fleet of heavy plant across multiple active sites

A specialist in temperature-controlled transport, based in Dartford and operating close to the M25 motorway network, came across us through a Google search when a truck needed repairing.

This repair came to us through one of our Fleet Management company customers, who contacted us on behalf of an ambulance operator following a significant incident.
GET IN TOUCH
Tags: